PROJECTS
This Perth workshop contacted APCINFRA because their existing ducting system was not effective enough.
After conducting a site survey to determine the hoods and ducting layout and performing engineering calculations to check the performance of extraction hoods and ducting, we chose to resize the extraction fan to meet the requirements. The team at APCINFRA designed, fabricated and installed the new system.
In the end, we function tested the new system and our client was very happy with the improved suction.